Send us the plans. We’ll bring back the number.

Estval is a done-for-you estimating service for general contractors. Upload your plan set and our estimators run the takeoff, price it for your market, and send back a bid-ready estimate — usually within a business day.

Every estimate is verified by a person before it reaches you. No software to learn, no seats to buy.

ESTVAL · BID-READY ESTIMATE EST-2026-0141
Project: Maple & 5th — retail shell, 6,400 SF
Prepared by: your Estval estimator
Plans received: Tue 4:12 PM
Returned: Wed 11:05 AM
Sample estimate line items with quantities and amounts
DivScopeQtyAmount
03 30 00Cast-in-place concrete214 CY$88,168
05 12 00Structural steel18.5 T$77,330
06 10 00Rough carpentry12,400 BF$35,340
09 29 00Gypsum board — taking off…
Running total $200,838

SAMPLE — illustrative quantities & rates

A real takeoff, from your actual drawings.

We measure the work the way you would: quantities pulled straight off the plan set, organized by CSI division, with the scope your subs expect to see. Structural, architectural, MEP — the whole set, not a guess from the square footage.

  • Quantities taken off every sheet, not factored from one
  • CSI division structure your subs already recognize
  • Spec books and addenda read and folded into the number
BOOKED FROM THE DRAWINGSSAMPLE
03 30 00Cast-in-place concrete — 214 CY @ $412$88,168
05 12 00Structural steel — 18.5 T @ $4,180$77,330
06 10 00Rough carpentry — 12,400 BF @ $2.85$35,340
 Booked so far$200,838
PRICED FOR YOUR MARKETSAMPLE
07 21 00Thermal insulation — 9,600 SF @ $1.92$18,432
08 11 00Doors & frames — 24 EA @ $1,240$29,760
09 29 00Gypsum board — 21,300 SF @ $2.35$50,055
09 65 00Resilient flooring — 6,400 SF @ $6.10$39,040
 Booked so far$338,125

Priced like you’d price it — for where you build.

Labor, material, and equipment broken out per line, at rates for your region — a job in Denver isn’t priced like a job in Dallas. Overhead and profit go where you want them, at the markup you tell us.

  • Unit costs shown on every line — nothing hidden in a lump sum
  • Regional pricing, not a national average
  • Your markup, your O&P structure

Then a person checks every number.

Before anything reaches you, an estimator walks the estimate against the drawings — quantities, scope gaps, pricing that looks off for the market. If something on your plans is ambiguous, we flag it as a clarification instead of burying a guess in the number.

ESTIMATOR VERIFIED

CHECKED & BOOKEDSAMPLE
22 00 00  Plumbing — complete system$64,500
23 00 00  HVAC — complete system$98,700
26 00 00  Electrical — complete system$112,400
 All divisions booked$613,725

Three steps. One business day, usually.

No software to learn. No account setup before you can start. The first move takes about five minutes.

STEP 1 — ~5 MINUTES

Send us your plans

Upload the plan set — PDFs, scans, even a zip of the whole bid package — with the project basics and your bid date.

STEP 2 — WE WORK

We estimate and verify

Our team runs the takeoff and pricing, then an estimator checks every line against your drawings before it goes anywhere.

STEP 3 — USUALLY NEXT DAY

Your bid comes back

A bid-ready estimate lands in your project workspace, where you can talk directly with the estimator who built it.

What comes back is ready to bid with.

  • The full estimateEvery line with quantity, unit cost, and extended amount — organized by CSI division.
  • A proposal you can sendA clean, owner-facing bid document with your markup and terms — sign it and send it.
  • Clarifications & exclusionsAnything ambiguous on the plans is flagged in writing, not silently guessed at.
  • A direct line to your estimatorQuestions, scope changes, a second look — talk to the person who built your number, in your project workspace.

Built for the week of bid day.

You’re juggling three bids and a job that’s pouring Thursday. The takeoff is the part that eats your nights — so hand it to us. You review a finished number instead of building one, and you still control everything that matters: scope, markup, and the final call.

If we’re missing something — an addendum, a spec section, a sheet that didn’t scan — we ask before we price it.

Straight answers.

Who actually builds the estimate?

Our estimating team, on our in-house takeoff and pricing system, with a human estimator verifying every line before it goes out. Nothing reaches you unchecked.

What does it cost?

Flat and quoted up front — send the plans and we’ll confirm the price before any work starts. No subscriptions, no seats, no long-term commitment.

How fast is it really?

Most plan sets come back within a business day. Tight bid date? Tell us when you upload and we’ll tell you honestly whether we can hit it.

What about my plans?

Your drawings stay private — encrypted in transit and at rest, used only to build your estimate, never shared. See our security page.

What kind of work do you price?

Commercial and residential general construction — new builds, remodels, tenant improvements. Trade-scoped estimates for subs, too. Not sure yours fits? Ask us.

What if I disagree with a number?

Tell your estimator in the workspace — they’ll walk you through how it was built, and fix it if it’s wrong. It’s your bid; we work for you.

The takeoff is our night. The bid is yours.

Send today’s plan set and see what comes back. Five minutes to upload — then it’s our problem until the number is ready.

Not ready to upload? Talk to us first.

ESTVAL · BID SUMMARYSAMPLE
Direct cost — all divisions$613,725
Overhead & profit @ 12%$73,647
Clarifications & exclusions3 noted
Bid total$687,372
ESTIMATOR VERIFIED